August 6 to September 1, 2004
Land Site Preparation


Click on a photo to view a larger and more detailed version

A lot of work was involved with preparing the land sites to accommodate the new cables. Large vaults, used for anchoring the composite cable at landfall, were set at Blakely North, Blakely South, Decatur North and Orcas at Deer Point.

Left: The M/V Pintail transports a vault to Decatur for offload

Below Left: The vaults were transported by truck to the vault sites

Below: The vault pit at Blakely North

Below Left: The vault being set into the pit

Below: Backfilling around the installed vault and lid